级配碎石计算器
按级配计算碎石的吨数与立方码数——含粉基层料、57 号、411 号等——并采用各自实际的压实密度。
公式与数据最后核对于 — Cosyslabs
输入
Result
Crushed stone needed
11.3 tons
Volume
6.22 yd³
- Weight
- 22680 lb
- Density used
- 135 lb/ft³
- Compaction lifts
- 1 lift
- Coverage
- 480 ft²
Waste default: 5% — 5% 用于散落到边界之外以及留在车厢中的部分。
Diagram
Estimates only. Verify with a licensed contractor or supplier before purchasing. Rough Estimator! is not responsible for shortages, overages, or material variances. See our methodology for formulas and sources.
公式
体积 ft³ = 长 × 宽 × (厚 in ÷ 12) × (1 + 损耗) · 吨数 = ft³ × 密度 ÷ 2000
参考资料
Related tools & materials
Don't forget
- 土工布
- 平板夯
- 边缘约束
- 标高桩
Also useful
常见问题
把长、宽、厚(英尺)相乘,乘以该级配的密度再除以 2,000。12 × 3.7 米、厚 10 厘米的车道基层约需 10.8 吨。
Ad space
Cite this page
Cosyslabs. (2026). 级配碎石计算器. Rough Estimator!. https://roughestimator.com/zh/crushed-stone-calculator
Embed on your site
Free for any site — attribution appreciated.
<iframe src="https://roughestimator.com/zh/crushed-stone-calculator?embed=1" title="级配碎石计算器" width="100%" height="640" style="border:0;border-radius:12px" loading="lazy"></iframe>